2. Project Title |
Mchuchuma Coal to Electricity Project |
|
Project description |
Location:
The Mchuchuma Coal to Electricity Project is located some 600km inland in the Southern Western part of Tanzania near lake Nyasa and close to its border with Malawi in the west and Mozambique in the South. It is situated in the Ludewa district, Iringa region in Tanzania. The project lies between latitudes 10°14'30" S and Longitudes 34°38'00" E and 34°53'20" E, at an altitude of about 1030m above mean sea level.
The establishment of an open-cast coal mine of 1.5 million tones per annum at the Mchuchuma Coalfield and the setting up of a 400MW linked, mine-mouth Thermal Power Station is intended to increase the reliability and security of grid power in order to attract and enable investments in various sectors of the modern economy of Tanzania. Furthermore, the Project is recognized as one of the two Anchor Projects for the realization of the Mtwara Development Corridor (MtDC), which is a SADC Regional Spatial Development Initiative (SDI) to unlock the vast economic potentials of the Southern Regions of Tanzania with trade and investment linkages to the adjoining districts of the neighboring countries of Malawi, Mozambique and Zambia. The project will consist of:
- A single product Coal Mine on the Mchuchuma and Katewaka reserves owned by Government of Tanzania. The mine will produce steam coal of the required grade exclusively for power generation.
- The Power Station that will generate power for the national grid. The power station’s generation output would be 4 x 100MW.
- A Transmission System is to be erected to connect into the national grid.
- The development of the village on the shores of Lake Nyasa. The Manda Village will support the identified infrastructure requirements for the power station and Coal Mine.
Coal reserves:
Total Coal Reserve - 535.75MT
Proven Category - 158.80MT
Indicated Category - 376.95MT
|
|
Programme allocation |
Mtwara Development Corridor |
|
Country |
Tanzania |
|
Economic sector |
Mining and Quarrying |
|
Est Capex value ($US millions) |
600 - 680 |
|
Project stage |
Market Appraisal |
|
Current status (WIP) |
NDC is conducting a detailed financial and economic appraisal of the integrated project before invitation of expression of interest.
|
|
Preferred Mode of Investment |
PPP |
|
No.of jobs created |
11,964 direct jobs and 32,832 indirect jobs |